Employer and Design Consultant

Concept design report

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
FIDIC White Book 2017
Time limit
Set by the agreement
Format
PowerPoint, 12 slidesWord, 11 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Concept designRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Options studied, the recommended scheme with massing and planning compliance, area statement, outline specification, order of cost estimate and the decisions needed from the Employer.
  • Sent by the Design Consultant to the Employer.
  • Written to FIDIC White Book 2017.
  • Step 6 of 15 in the Design appointment and design development process.

What you get

Save with a pack

Design Consultant to Employer: Concept design8 documents. Includes this document.
AED 763AED 499Save AED 264
Design appointment and design development process: Design Consultant steps8 documents. Includes this document.
AED 1,292AED 899Save AED 393

Free basic version or the full version

Free

Basic version

  • The English Word form, 11 pages
  • No payment and no sign-up
  • A line in the footer: Free basic version from builderdraft.com
Download free
Full version

AED 149

  • The same Word form, with no line in the footer
  • PowerPoint, 12 slides
  • One-page guide on when and how to use it
  • Your logo and company details on every file
How to write it

How to write a concept design report

The concept design report closes the concept stage. It shows the options studied, recommends one, and asks the client to approve the scheme, the cost limit and the decisions that let schematic design start. Every figure in it should come from one source: the area schedule, the cost plan and the design basis.

What to include

  1. 1The brief, and the decision requested from the client
  2. 2The options studied, scored against weighted criteria
  3. 3The recommended scheme, with massing, plans and planning compliance
  4. 4The area statement: gross floor area, net areas and parking
  5. 5An outline specification and the design basis for each discipline
  6. 6The order of cost estimate, and the programme to the next stage
  7. 7The risks, and the decisions needed from the client, each with a date

When to use it

At the end of concept design, before schematic design starts. Present it at an approval meeting and ask for written approval that names the scheme, the cost limit and the brief it meets.

Sample wording
We recommend Option B, a 14-storey tower over a 3-level podium, with a gross floor area of 38,400 m² and 410 parking spaces. It meets the plot’s height and setback limits and scored highest on the weighted criteria. The order of cost estimate is AED 196 million excluding VAT. We ask the Client to approve the scheme and the cost limit by 30 June 2026.

Common mistakes

  • Different area or cost figures in different sections
  • Recommending a scheme without showing the options it beat
  • No clear list of decisions, so approval drags on

Questions people ask

What if the client changes the brief after approval?

A change asked for after the concept is approved is a change to the brief. It is recorded as a variation to the consultancy agreement, with its own time and fee.

How accurate is the cost at concept stage?

It is an order of cost estimate, based on floor areas and rates, with risk allowances. It sets the cost limit, which the elemental cost plan then tests at each later stage.