Main Contractor and Subcontractor
AED 1,185AED 769Save AED 416
Door, window and ironmongery schedule with installation checklist
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Doors, windows and glazing, Joinery and doors
What this document does
- Opening by opening schedule tied to the drawings, with the installation and operation check.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
- Written for: Doors, windows and glazing, Joinery and doors.
What you get
- Excel schedules and summary sheet
- Fillable form
- A full Arabic copy of every file, right to left
- File: Excel, 6 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Doors, windows and glazing17 documents. Includes this document.