Main Contractor and Subcontractor
AED 782AED 509Save AED 273
Electrical testing forms
AED 129
Launch offerAED 64.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 8 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Electrical, Street lighting
What this document does
- Insulation resistance, earth continuity and loop, panel inspection, load test and lighting lux records.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Electrical, Street lighting.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 8 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Electrical8 documents. Includes this document.