Main Contractor and Subcontractor
Electrical testing forms
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Electrical, Street lighting
What this document does
- Insulation resistance, earth continuity and loop, panel inspection, load test and lighting lux records.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Electrical, Street lighting.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project