Engineer and Main Contractor
AED 176AED 109Save AED 67
Engineer’s consent to subcontractor or supplier
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.4
Time limit
Set by the agreement
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- Records the consent and the conditions attached to it.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.4.
- Goes with: Subcontractor and supplier approval request
What you get
- Editable Word template
- An English copy, and a copy with English and Arabic side by side
- File: Word, 3 pages
- File: English and Arabic copy, 3 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Sign and start4 documents. Includes this document.