Engineer’s determination
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 3.5
Time limit
The Engineer responds within 42 days of receiving the detailed claim (Sub-Clause 20.1)
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Fair determination of time and cost after consulting both parties, with reasons.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 3.5.
- Time limit: The Engineer responds within 42 days of receiving the detailed claim (Sub-Clause 20.1).
- Step 7 of 10 in the Delay and extension of time process.
What you get
- Editable Word template
- An English copy, and a copy with English and Arabic side by side
- One-page guide on when and how to use it
- File: Word, 3 pages
- File: English and Arabic copy, 3 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
Delay and extension of time process: Supervision Consultant steps3 documents. Includes this document.
Where it sits in the processes
Delay and extension of time, step 7 of 10View all
BeforeFully detailed extension of time and prolongation claim
This documentEngineer’s determination
AfterEngineer’s recommendation to the Employer (time and cost)