Engineer and Main Contractor
Engineer’s determination
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 3.5
Time limit
The Engineer responds within 42 days of receiving the detailed claim (Sub-Clause 20.1)
Format
WordLanguage: English and Arabic
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Fair determination of time and cost after consulting both parties, with reasons.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 3.5.
- Time limit: The Engineer responds within 42 days of receiving the detailed claim (Sub-Clause 20.1).
- Step 7 of 10 in the Delay and extension of time process.
What you get
- Editable Word template
- English and Arabic text side by side
- One-page guide on when and how to use it
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Delay and extension of time, step 7 of 10View all
BeforeFully detailed extension of time and prolongation claim
This documentEngineer’s determination
AfterEngineer’s recommendation to the Employer (time and cost)