Engineer and Main Contractor

Engineer’s determination

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 3.5
Time limit
The Engineer responds within 42 days of receiving the detailed claim (Sub-Clause 20.1)
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Fair determination of time and cost after consulting both parties, with reasons.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 3.5.
  • Time limit: The Engineer responds within 42 days of receiving the detailed claim (Sub-Clause 20.1).
  • Step 7 of 10 in the Delay and extension of time process.

What you get

Save with a pack

Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
AED 454AED 299Save AED 155
Delay and extension of time process: Supervision Consultant steps3 documents. Includes this document.
AED 207AED 139Save AED 68

Where it sits in the processes