Employer and Supervision Consultant
AED 415AED 269Save AED 146
AED 285AED 199Save AED 86
Engineer’s recommendation for taking over
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
Supervision ConsultantEmployer
Clause
FIDIC 1999 Red BookSub-Clause 10.1
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 6. Handover and close-outRoute: Both routes
What this document does
- Confirms readiness after the joint inspection and lists the outstanding items to be attached to the certificate.
- Sent by the Supervision Consultant to the Employer.
- Written to FIDIC 1999 Red Book, Sub-Clause 10.1.
- Step 7 of 14 in the Handover, defects and close-out process.
What you get
- Report template with sections
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Supervision Consultant to Employer: Handover and close-out5 documents. Includes this document.
Handover, defects and close-out process: Supervision Consultant steps5 documents. Includes this document.
Where it sits in the processes
Handover, defects and close-out, step 7 of 14View all
BeforeSnag list and joint inspection record
This documentEngineer’s recommendation for taking over
AfterAsset transfer form