Facade shop drawing and calculation submittal checklist
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
Word, 5 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Facade and curtain wall, Doors, windows and glazing
What this document does
- What a complete facade submittal contains: system drawings, structural calculations, thermal and acoustic data and fixings.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
- Written for: Facade and curtain wall, Doors, windows and glazing.
What you get
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Facade and curtain wall17 documents. Includes this document.