Main Contractor and Subcontractor
AED 752AED 489Save AED 263
Fire fighting and alarm test records
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Fire fighting and alarm
What this document does
- Hydrostatic tests, pump performance, sprinkler flow and the alarm cause-and-effect test matrix for authority witnessing.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Fire fighting and alarm.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 7 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Fire fighting and alarm8 documents. Includes this document.