Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Fire fighting and alarm test records

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Fire fighting and alarm

What this document does

  • Hydrostatic tests, pump performance, sprinkler flow and the alarm cause-and-effect test matrix for authority witnessing.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
  • Written for: Fire fighting and alarm.

What you get

Save with a pack

Subcontractor to Main Contractor: Handover and close, Fire fighting and alarm8 documents. Includes this document.
AED 752AED 489Save AED 263

Also used between