Main Contractor and Subcontractor
AED 1,116AED 729Save AED 387
Flooring and tiling setting-out and inspection checklist
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Flooring and tiling
What this document does
- Levels, falls, setting-out, joints and hollowness checks by area.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Written for: Flooring and tiling.
What you get
- Fillable form
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Flooring and tiling16 documents. Includes this document.