Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Flooring and tiling setting-out and inspection checklist

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Flooring and tiling

What this document does

  • Levels, falls, setting-out, joints and hollowness checks by area.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Flooring and tiling.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Flooring and tiling16 documents. Includes this document.
AED 1,116AED 729Save AED 387

Also used between