Main Contractor and Subcontractor

Flooring and tiling setting-out and inspection checklist

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Flooring and tiling

What this document does

  • Levels, falls, setting-out, joints and hollowness checks by area.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Flooring and tiling.