Engineer and Main Contractor
Fully detailed claim for extension of time and cost (FIDIC 2017)
AED 249
Launch offerAED 124.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 2017 Red and Yellow BooksSub-Clause 20.2.4
Time limit
Within 84 days of awareness of the event, with the legal basis, or the notice lapses
Format
Word, 9 pagesExcel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- The four parts Sub-Clause 20.2.4 requires: the event, the contractual and legal basis, the records relied on, and the delay analysis and cost build-up.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 2017 Red and Yellow Books, Sub-Clause 20.2.4.
- Time limit: Within 84 days of awareness of the event, with the legal basis, or the notice lapses.
What you get
- Editable Word template
- Excel schedules and summary sheet
- Worked example
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Word, 9 pages
- File: Excel, 7 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project