Fully detailed claim for extension of time and cost (FIDIC 2017)

AED 249
Launch offerAED 124.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 2017 Red and Yellow BooksSub-Clause 20.2.4
Time limit
Within 84 days of awareness of the event, with the legal basis, or the notice lapses
Format
Word, 9 pagesExcel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 2017 Red Book.

What this document does

  • The four parts Sub-Clause 20.2.4 requires: the event, the contractual and legal basis, the records relied on, and the delay analysis and cost build-up.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 2017 Red and Yellow Books, Sub-Clause 20.2.4.
  • Time limit: Within 84 days of awareness of the event, with the legal basis, or the notice lapses.