Engineer and Main Contractor
Handover documents index
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- As-builts, O&M manuals, warranties, spares, test certificates, training records and authority certificates with status.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
What you get
- Excel register with automatic totals
- Checklist of attachments
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download