Engineer and Main Contractor
AED 1,126AED 729Save AED 397
HSE monthly statistics and incident notification
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 6.7
Time limit
Set by the agreement
Format
Word, 6 pagesExcel, 9 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Hours, incidents, inspections and training in a monthly sheet, with the immediate incident notification form.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 6.7.
What you get
- Excel schedules and summary sheet
- Fillable form
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 6 pages
- File: Excel, 9 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Build and monitor16 documents. Includes this document.