Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Inspection and test plan

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Activities, tests, acceptance criteria, hold and witness points and who signs each one.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.4.

What you get

Save with a pack

Main Contractor to Engineer: Build and monitor16 documents. Includes this document.
AED 1,126AED 729Save AED 397

Also used between