Main Contractor and Subcontractor

Joinery sample, finish and hardware approval record

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.2
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Joinery and doors

What this document does

  • Sample approval with veneer, finish, edge and hardware references for repeatable production.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.2.
  • Written for: Joinery and doors.

What you get

How to write it

How to record a joinery sample approval

Joinery is made in batches over months, so the approved sample must be described well enough to be repeated. The record lists every reference, from board and veneer to finish, colour, sheen and hardware. Under Sub-Clause 7.2 of the FIDIC 1999 Red Book, samples are submitted for the Engineer’s consent, each labelled with its origin and intended use.

What to include

  1. 1The item: vanity unit, wardrobe, panelling, door or counter, and where it goes
  2. 2The construction: board type, thickness and fire or moisture rating
  3. 3The veneer or laminate, the edge and the finish system
  4. 4The colour, the sheen level and the finish sample reference
  5. 5Hardware: hinges, handles, locks and runners, with makes and codes
  6. 6The sample label, photographs and the date the sample was submitted
  7. 7The Engineer’s decision and comments, signed

When to use it

For each joinery item, before production starts. Once approved, sign and label the sample and keep it on site as the control sample until the work is complete.

Read the full guideMaterial submittals in construction: the package, approval codes and samples
Sample wording
Sample JS-05, vanity unit type V2, guest bathrooms on Levels 3 to 12: 18 mm moisture-resistant MDF, walnut veneer, 2 mm matching edge band, clear lacquer at 30% sheen, soft-close hinges and push-to-open drawers. Approved by the Engineer on 18 June 2026, code B: match the grain direction on adjacent doors.

Common mistakes

  • Starting production before approval
  • Changing the supplier or the finish without a new sample
  • Missing references, so a later batch cannot be checked against the sample

Questions people ask

Who pays for samples?

Under Sub-Clause 7.2, the manufacturer’s standard samples and the samples the contract specifies are at the Contractor’s cost. Extra samples the Engineer instructs are a Variation.

What if a delivered batch does not match the sample?

Compare it with the control sample and the recorded references. The Engineer may reject work that does not comply (Sub-Clause 7.5), and the Contractor makes it good.

Also used between