Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Key staff approval request

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.3
Time limit
Set by the agreement
Format
Word, 3 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Proposes the Contractor’s Representative and key staff with CVs for the Engineer’s consent.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 4.3.

What you get

Save with a pack

Main Contractor to Engineer: Sign and start4 documents. Includes this document.
AED 296AED 189Save AED 107