Kitchen and laundry equipment installation and handover checklist
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Kitchens and laundry
What this document does
- Equipment schedule, connections, start-up, training and warranty documents by item.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Kitchens and laundry.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Kitchens and laundry8 documents. Includes this document.