Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Kitchen and laundry equipment installation and handover checklist

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Kitchens and laundry

What this document does

  • Equipment schedule, connections, start-up, training and warranty documents by item.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
  • Written for: Kitchens and laundry.

What you get

Save with a pack

Subcontractor to Main Contractor: Handover and close, Kitchens and laundry8 documents. Includes this document.
AED 702AED 459Save AED 243

Also used between