Landscape planting, irrigation test and maintenance period record

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Landscape and irrigation

What this document does

  • Soft and hard landscape inspection, irrigation pressure and coverage test and the establishment period log.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
  • Written for: Landscape and irrigation.