Main Contractor and Subcontractor
AED 712AED 459Save AED 253
Landscape planting, irrigation test and maintenance period record
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Landscape and irrigation
What this document does
- Soft and hard landscape inspection, irrigation pressure and coverage test and the establishment period log.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Landscape and irrigation.
What you get
- Excel schedules and summary sheet
- Fillable form
- A full Arabic copy of every file, right to left
- File: Excel, 6 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Landscape and irrigation8 documents. Includes this document.