Main Contractor and Subcontractor
AED 732AED 479Save AED 253
Lift installation inspection and third-party certification checklist
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Word, 6 pagesExcel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Lifts and escalators
What this document does
- Shaft and pit checks, installation stages, load test and the third-party inspection documents.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Lifts and escalators.
What you get
- Checklist of attachments
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 6 pages
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Lifts and escalators8 documents. Includes this document.