Engineer and Main Contractor
AED 594AED 389Save AED 205
Measurement and dayworks sheets
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 12.1
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 6. PaymentsRoute: Design-Bid-Build. Scope: Supply and install, Install only, Design, supply and install, Labour only
What this document does
- Joint measurement records and daywork sheets signed on the day the work is done.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 12.1.
- For Design-Bid-Build projects only.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Payments6 documents. Includes this document.