MEP coordination and builder’s work drawing submittal checklist

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls

What this document does

  • Combined services drawings, ceiling void sections, sleeves and openings schedule and clash sign-off.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
  • Written for: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls.