Main Contractor and Subcontractor
MEP installation inspection and test plan
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls
What this document does
- First fix, second fix and final inspection stages for each service with hold points and test references.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
- Written for: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project