Method statement set, civil and structure

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Piling and shoring, Earthworks and enabling, Concrete structure, Structural steel, Precast

What this document does

  • Method statements for piling, excavation and shoring, concreting, structural steel erection and precast, each with its risk assessment.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Written for: Piling and shoring, Earthworks and enabling, Concrete structure, Structural steel, Precast.