Main Contractor and Subcontractor
AED 1,364AED 889Save AED 475
Method statement set, civil and structure
AED 129
Launch offerAED 64.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 14 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Piling and shoring, Earthworks and enabling, Concrete structure, Structural steel, Precast
What this document does
- Method statements for piling, excavation and shoring, concreting, structural steel erection and precast, each with its risk assessment.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Written for: Piling and shoring, Earthworks and enabling, Concrete structure, Structural steel, Precast.
What you get
- Editable Word template
- Checklist of attachments
- Worked example
- A full Arabic copy of every file, right to left
- File: Word, 14 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Piling and shoring18 documents. Includes this document.