Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Method statement set, civil and structure

AED 129
Launch offerAED 64.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 14 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Piling and shoring, Earthworks and enabling, Concrete structure, Structural steel, Precast

What this document does

  • Method statements for piling, excavation and shoring, concreting, structural steel erection and precast, each with its risk assessment.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Written for: Piling and shoring, Earthworks and enabling, Concrete structure, Structural steel, Precast.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Piling and shoring18 documents. Includes this document.
AED 1,364AED 889Save AED 475

Also used between