Main Contractor and Subcontractor
AED 1,225AED 799Save AED 426
Method statement set, envelope
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 12 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Facade and curtain wall, Roofing and waterproofing, Doors, windows and glazing
What this document does
- Method statements for facade installation, roofing and waterproofing, and glazing, with working at height controls.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Written for: Facade and curtain wall, Roofing and waterproofing, Doors, windows and glazing.
What you get
- Editable Word template
- Checklist of attachments
- Worked example
- A full Arabic copy of every file, right to left
- File: Word, 12 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Facade and curtain wall17 documents. Includes this document.