Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Method statement set, envelope

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 12 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Facade and curtain wall, Roofing and waterproofing, Doors, windows and glazing

What this document does

  • Method statements for facade installation, roofing and waterproofing, and glazing, with working at height controls.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Written for: Facade and curtain wall, Roofing and waterproofing, Doors, windows and glazing.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Facade and curtain wall17 documents. Includes this document.
AED 1,225AED 799Save AED 426

Also used between