Main Contractor and Subcontractor

Method statement set, MEP

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls

What this document does

  • Method statements for ductwork, piping, cabling, equipment installation and testing and commissioning.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Written for: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls.