Main Contractor and Subcontractor
Method statement set, MEP
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls
What this document does
- Method statements for ductwork, piping, cabling, equipment installation and testing and commissioning.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Written for: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls.
What you get
- Editable Word template
- Checklist of attachments
- Worked example
- File: Word
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project