Main Contractor and Subcontractor
AED 1,255AED 819Save AED 436
Method statement set, MEP
AED 129
Launch offerAED 64.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 14 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls
What this document does
- Method statements for ductwork, piping, cabling, equipment installation and testing and commissioning.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Written for: HVAC, Electrical, Plumbing and drainage, Fire fighting and alarm, ELV and ICT, BMS and controls.
What you get
- Editable Word template
- Checklist of attachments
- Worked example
- A full Arabic copy of every file, right to left
- File: Word, 14 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, HVAC17 documents. Includes this document.