Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Method statement set, specialist and external

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 16 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Lifts and escalators, Pools and water features, Kitchens and laundry, Landscape and irrigation, Signage, Roads and paving, Utility networks, Street lighting

What this document does

  • Method statements for lifts, pools, kitchens, landscape, signage, roads and utilities.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Written for: Lifts and escalators, Pools and water features, Kitchens and laundry, Landscape and irrigation, Signage, Roads and paving, Utility networks, Street lighting.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Lifts and escalators15 documents. Includes this document.
AED 1,077AED 699Save AED 378

Also used between