Method statement set, specialist and external

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Lifts and escalators, Pools and water features, Kitchens and laundry, Landscape and irrigation, Signage, Roads and paving, Utility networks, Street lighting

What this document does

  • Method statements for lifts, pools, kitchens, landscape, signage, roads and utilities.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Written for: Lifts and escalators, Pools and water features, Kitchens and laundry, Landscape and irrigation, Signage, Roads and paving, Utility networks, Street lighting.