Method statement set, specialist and external
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Word, 16 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Lifts and escalators, Pools and water features, Kitchens and laundry, Landscape and irrigation, Signage, Roads and paving, Utility networks, Street lighting
What this document does
- Method statements for lifts, pools, kitchens, landscape, signage, roads and utilities.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Written for: Lifts and escalators, Pools and water features, Kitchens and laundry, Landscape and irrigation, Signage, Roads and paving, Utility networks, Street lighting.
What you get
- Editable Word template
- Checklist of attachments
- Worked example
- A full Arabic copy of every file, right to left
- File: Word, 16 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Lifts and escalators15 documents. Includes this document.