Engineer and Main Contractor

Notice of claim (FIDIC 2017)

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 2017 Red and Yellow BooksSub-Clause 20.2.1
Time limit
Not later than 28 days after awareness; the fully detailed claim follows within 84 days
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 2017 Red Book.

What this document does

  • Notice under Sub-Clause 20.2.1 with the particulars, the Sub-Clauses that give time, Cost or profit, and the time limits that follow.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 2017 Red and Yellow Books, Sub-Clause 20.2.1.
  • Time limit: Not later than 28 days after awareness; the fully detailed claim follows within 84 days.

What you get