Engineer and Main Contractor
Notice of claim (FIDIC 2017)
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 2017 Red and Yellow BooksSub-Clause 20.2.1
Time limit
Not later than 28 days after awareness; the fully detailed claim follows within 84 days
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Notice under Sub-Clause 20.2.1 with the particulars, the Sub-Clauses that give time, Cost or profit, and the time limits that follow.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 2017 Red and Yellow Books, Sub-Clause 20.2.1.
- Time limit: Not later than 28 days after awareness; the fully detailed claim follows within 84 days.
What you get
- Editable Word template
- Time-limit reminder table
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project