Notice of error in the Employer’s Requirements
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 1.9
Time limit
Within the period stated in the Appendix to Tender, counted from the Commencement Date (Sub-Clause 5.1)
Format
WordLanguage: English
Stage
Post-contract: 5. Changes and claimsRoute: Design and Build
What this document does
- Notifies an error that an experienced contractor could not have discovered at tender, with the time and cost consequence claimed.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 1.9.
- Time limit: Within the period stated in the Appendix to Tender, counted from the Commencement Date (Sub-Clause 5.1).
- For Design and Build projects only.
What you get
- Editable Word template
- Time-limit reminder table
- One-page guide on when and how to use it