Main Contractor and Subcontractor
AED 1,116AED 729Save AED 387
Painting surface preparation and coat inspection record
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Painting and coatings
What this document does
- Moisture, preparation, primer and each coat recorded by area with dry film thickness where specified.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Written for: Painting and coatings.
What you get
- Fillable form
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Painting and coatings16 documents. Includes this document.