Main Contractor and Subcontractor

Painting surface preparation and coat inspection record

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Painting and coatings

What this document does

  • Moisture, preparation, primer and each coat recorded by area with dry film thickness where specified.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Painting and coatings.