Main Contractor and Subcontractor
Painting surface preparation and coat inspection record
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Painting and coatings
What this document does
- Moisture, preparation, primer and each coat recorded by area with dry film thickness where specified.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Written for: Painting and coatings.
What you get
- Fillable form
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project