Main Contractor and Subcontractor
AED 1,364AED 889Save AED 475
Piling inspection and test plan with pile record sheet
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Piling and shoring
What this document does
- Hold and witness points from setting out to cut-off, with the pile record sheet: depth, concrete volume, cage check and integrity and load test results.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
- Written for: Piling and shoring.
What you get
- Excel schedules and summary sheet
- Fillable form
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Piling and shoring18 documents. Includes this document.