Main Contractor and Subcontractor
AED 732AED 479Save AED 253
Plumbing pressure test, flushing and disinfection records
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Plumbing and drainage, Utility networks
What this document does
- Hydrostatic test sheets by system, flushing and disinfection certificates and drainage test records.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Plumbing and drainage, Utility networks.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 6 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Plumbing and drainage8 documents. Includes this document.