Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Plumbing pressure test, flushing and disinfection records

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Plumbing and drainage, Utility networks

What this document does

  • Hydrostatic test sheets by system, flushing and disinfection certificates and drainage test records.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
  • Written for: Plumbing and drainage, Utility networks.

What you get

Save with a pack

Subcontractor to Main Contractor: Handover and close, Plumbing and drainage8 documents. Includes this document.
AED 732AED 479Save AED 253

Also used between