Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Pool water tightness, filtration and water quality test records

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Pools and water features

What this document does

  • Water tightness test, filtration run, chemical balance and safety equipment checks before handover.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
  • Written for: Pools and water features.

What you get

Save with a pack

Subcontractor to Main Contractor: Handover and close, Pools and water features8 documents. Includes this document.
AED 712AED 459Save AED 253

Also used between