Main Contractor and Subcontractor
AED 712AED 459Save AED 253
Pool water tightness, filtration and water quality test records
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Pools and water features
What this document does
- Water tightness test, filtration run, chemical balance and safety equipment checks before handover.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Pools and water features.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 6 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Pools and water features8 documents. Includes this document.