Main Contractor and Subcontractor

Pool water tightness, filtration and water quality test records

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Pools and water features

What this document does

  • Water tightness test, filtration run, chemical balance and safety equipment checks before handover.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
  • Written for: Pools and water features.

What you get

Also used between