Main Contractor and Subcontractor
Pool water tightness, filtration and water quality test records
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Pools and water features
What this document does
- Water tightness test, filtration run, chemical balance and safety equipment checks before handover.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Pools and water features.
What you get
- Excel schedules and summary sheet
- Checklist of attachments
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project