Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Post-tender clarification letter

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 2. Evaluation and awardRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

What you get

Save with a pack

Employer to Main Contractor: Evaluation and award11 documents. Includes this document.
AED 829AED 539Save AED 290
Main contract tender and award process: Employer steps6 documents. Includes this document.
AED 704AED 489Save AED 215

Free basic version or the full version

Free

Basic version

  • The English Word form, 4 pages
  • No payment and no sign-up
  • A line in the footer: Free basic version from builderdraft.com
Download free
Full version

AED 49

  • The same Word form, with no line in the footer
  • One-page guide on when and how to use it
  • Your logo and company details on every file
How to write it

How to write a post-tender clarification letter

During tender evaluation you may need a tenderer to confirm, complete or clarify its tender. A post-tender clarification letter asks those questions without inviting any change to the price or the substance of the tender. The only price change allowed is the correction of arithmetic errors under the instructions to tenderers.

What to include

  1. 1The tender, its reference and date
  2. 2Part A: each clarification on its own row, with its reference in the tender
  3. 3Part B: arithmetic corrections, as tendered and as corrected, and the corrected tender sum
  4. 4Part C: each qualification found, with a request to withdraw or keep it
  5. 5A short, fixed date to reply
  6. 6A statement that the reply must not change the price

When to use it

During evaluation, after the tenders are opened and checked. Give a short reply date, and where a question concerns a point common to all tenders, ask every tenderer the same question.

Read the full guideTender clarifications: queries, addenda and the best and final offer
Sample wording
B3: Bill 4, item 4.12, tiling. The tendered amount is AED 84,600; the quantity of 1,800 m² at the tendered rate of AED 52.00 gives AED 93,600. Under the instructions to tenderers the rate governs, so the amount is corrected to AED 93,600 and the tender sum from AED 21,400,000 to AED 21,409,000. Please confirm that you accept the correction.

Common mistakes

  • Inviting a lower price in a clarification letter: that is a best and final offer, sent to every shortlisted tenderer
  • Asking only one tenderer about a point that affects them all
  • Not keeping the replies with the evaluation

Questions people ask

What if the tenderer keeps a qualification?

Price it at your own estimate when you compare the tenders, so all the tenders are compared on the same basis.

Can a clarification change the tender price?

No. Only the arithmetic correction under the instructions to tenderers can change it, where the rate governs over the amount.