Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Tender analysis and recommendation report

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
FIDIC 1999 Red Book
Time limit
Set by the agreement
Format
Word, 7 pagesExcel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 9. Tender support and close-outRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Arithmetic checks, rates compared with the pre-tender estimate, qualifications and their cost, clarifications needed and the recommended tenderer.
  • Sent by the Design Consultant to the Employer.
  • Written to FIDIC 1999 Red Book.
  • Step 9 of 14 in the Main contract tender and award process.

What you get

  • Report template with sections
  • Excel schedules and summary sheet
  • One-page guide on when and how to use it
  • A full Arabic copy of every file, right to left
  • File: Word, 7 pages
  • File: Excel, 7 sheets
  • Language: English, plus a full Arabic copy
  • Brand-ready: your logo and company details go in when you download
  • Pay once and use it on every project

Save with a pack

Design Consultant to Employer: Tender support and close-out5 documents. Includes this document.
AED 395AED 259Save AED 136
Main contract tender and award process: Design Consultant steps2 documents. Includes this document.
AED 208AED 149Save AED 59

Where it sits in the processes

Main contract tender and award, step 9 of 14View all
BeforeTender submission pack
This documentTender analysis and recommendation report
AfterPost-tender clarification letter