Main Contractor and Subcontractor
AED 1,235AED 799Save AED 436
Precast production and erection records
AED 69
Launch offerAED 34.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Precast
What this document does
- Element casting records, dimensional checks, lifting and erection sign-off and joint inspection.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
- Written for: Precast.
What you get
- Excel schedules and summary sheet
- Fillable form
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Precast17 documents. Includes this document.