Main Contractor and Subcontractor

Precast production and erection records

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Precast

What this document does

  • Element casting records, dimensional checks, lifting and erection sign-off and joint inspection.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
  • Written for: Precast.