Programme review comments
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Notice within 21 days if the programme does not comply
Format
WordLanguage: English
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- The Engineer’s notice of the respects in which the programme does not comply with the contract.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Time limit: Notice within 21 days if the programme does not comply.
- Goes with: Baseline programme submission