Engineer and Main Contractor
AED 176AED 109Save AED 67
Programme review comments
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Notice within 21 days if the programme does not comply
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- The Engineer’s notice of the respects in which the programme does not comply with the contract.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Time limit: Notice within 21 days if the programme does not comply.
- Goes with: Baseline programme submission
What you get
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Sign and start4 documents. Includes this document.