Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Baseline programme submission

AED 129
Launch offerAED 64.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Within 28 days of receiving the notice of the Commencement Date
Format
Word, 5 pagesExcel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Programme narrative, logic and resource statement in the form the Engineer can review and accept.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
  • Time limit: Within 28 days of receiving the notice of the Commencement Date.
  • Goes with: Programme review comments

What you get

  • Editable Word template
  • Excel schedules and summary sheet
  • Checklist of attachments
  • One-page guide on when and how to use it
  • A full Arabic copy of every file, right to left
  • File: Word, 5 pages
  • File: Excel, 5 sheets
  • Language: English, plus a full Arabic copy
  • Brand-ready: your logo and company details go in when you download
  • Pay once and use it on every project

Save with a pack

Main Contractor to Engineer: Sign and start4 documents. Includes this document.
AED 296AED 189Save AED 107