Main Contractor and Supplier
AED 547AED 359Save AED 188
AED 178AED 119Save AED 59
Purchase order with terms and conditions
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorSupplier
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 7 pagesExcel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Supply only, Supply and install
What this document does
- Order form with protective terms: delivery, inspection, acceptance, payment, warranty, suspension and governing law, plus an order register.
- Sent by the Main Contractor to the Supplier.
- Written to UAE practice.
- Step 6 of 6 in the Material and shop drawing submittals process.
What you get
- Fillable form
- Editable Word template
- Register sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 7 pages
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Supplier: Sign and start3 documents. Includes this document.
Material and shop drawing submittals process: Main Contractor steps2 documents. Includes this document.
Where it sits in the processes
Material and shop drawing submittals, step 6 of 6View all