Employer and Supervision Consultant
AED 267AED 169Save AED 98
AED 128AED 89Save AED 39
Engineering review log
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Supervision ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Construction supervisionRoute: Both routes
What this document does
- Every submittal, shop drawing and query reviewed, with dates in and out, status code and turnaround, reported to the Employer each month.
- Sent by the Supervision Consultant to the Employer.
- Written to UAE practice.
- Step 5 of 6 in the Material and shop drawing submittals process.
What you get
- Excel register with automatic totals
- Log with status and ageing
- Dashboard page
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Supervision Consultant to Employer: Construction supervision4 documents. Includes this document.
Material and shop drawing submittals process: Supervision Consultant steps2 documents. Includes this document.
Where it sits in the processes
Material and shop drawing submittals, step 5 of 6View all
BeforeSubmittal review sheet with status code
This documentEngineering review log
AfterPurchase order with terms and conditions