Engineer and Main Contractor

Recovery programme and mitigation notice

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 8.6
Time limit
Set by the agreement
Format
Word, 5 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Revised methods to recover delay when progress falls behind, with the resource changes proposed.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.6.

What you get

Save with a pack

Main Contractor to Engineer: Changes and claims6 documents. Includes this document.
AED 654AED 429Save AED 225