Engineer and Main Contractor
AED 654AED 429Save AED 225
Recovery programme and mitigation notice
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 8.6
Time limit
Set by the agreement
Format
Word, 5 pagesExcel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Revised methods to recover delay when progress falls behind, with the resource changes proposed.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.6.
What you get
- Excel schedules and summary sheet
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Changes and claims6 documents. Includes this document.