Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Risk assessment and method statement (RAMS)

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 9 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Labour only
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Task risk assessment with control measures linked to the method statement, for high-risk activities.
  • Sent by the Main Contractor to the Engineer.
  • Written to UAE practice.

What you get

Save with a pack

Main Contractor to Engineer: Build and monitor16 documents. Includes this document.
AED 1,126AED 729Save AED 397

Free basic version or the full version

Free

Basic version

  • The English Word form, 9 pages
  • No payment and no sign-up
  • A line in the footer: Free basic version from builderdraft.com
Download free
Full version

AED 99

  • The same Word form, with no line in the footer
  • Worked example
  • Your logo and company details on every file
How to write it

How to write a RAMS

A RAMS joins the risk assessment for a task to the method statement for doing it, so the people on the job see the hazards, the controls and the steps in one place. It is prepared by the contractor or subcontractor doing the work, reviewed before work starts, and briefed to every worker, who signs it.

What to include

  1. 1The activity, its location, duration, workforce and plant
  2. 2The permits to work it needs, such as hot work, work at height or confined space
  3. 3How risks are rated: likelihood times severity, from 1 to 25
  4. 4Each hazard, who is at risk, and the risk before and after the controls
  5. 5The work steps in order, each linked to its controls
  6. 6Protective equipment, the first aider, the nearest hospital and the emergency numbers
  7. 7A briefing record signed by every worker

When to use it

Submit it before the activity starts, in time for the review the site rules set. Review it whenever the method, the crew or the conditions change, and brief each new worker before they start.

Sample wording
Activity: installing ductwork at high level, Level 3, grid lines C to F. Hazard 4: falling from the mobile elevating work platform. Risk before controls 4 x 4 = 16, high. Controls: trained operators, harness clipped to the anchor point, platform inspected every shift, exclusion zone below. Risk after controls 2 x 4 = 8, medium.

Common mistakes

  • Generic hazards copied from another job that do not match the task
  • Controls that rely only on protective equipment
  • No rescue plan for work at height or in confined spaces
  • Workers starting without being briefed and signing

Questions people ask

What is the difference between a RAMS and a method statement?

A method statement explains how the work is done. A RAMS adds the risk assessment, so each step carries its hazards and controls. Many UAE sites ask for both in one document for high-risk activities.

Which emergency numbers go on a RAMS in the UAE?

Police 999, ambulance 998 and civil defence 997, plus the site office, the first aider and the route to the nearest hospital.

Also used between