Main Contractor and Subcontractor

Road layer testing and paving inspection register

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Roads and paving

What this document does

  • Subgrade, sub-base, base and asphalt layer tests with core results and surface checks.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
  • Written for: Roads and paving.

What you get

Also used between