Main Contractor and Subcontractor
AED 1,205AED 779Save AED 426
Road layer testing and paving inspection register
AED 69
Launch offerAED 34.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Roads and paving
What this document does
- Subgrade, sub-base, base and asphalt layer tests with core results and surface checks.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
- Written for: Roads and paving.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Roads and paving17 documents. Includes this document.