Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Signage schedule and installation sign-off

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Signage

What this document does

  • Sign by sign schedule with artwork approval, location and installation check.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
  • Written for: Signage.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Signage16 documents. Includes this document.
AED 1,116AED 729Save AED 387

Also used between