Main Contractor and Subcontractor

Signage schedule and installation sign-off

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Signage

What this document does

  • Sign by sign schedule with artwork approval, location and installation check.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 4.1.
  • Written for: Signage.

What you get

Also used between