Main Contractor and Subcontractor
AED 831AED 539Save AED 292
Street lighting lux and electrical test record
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Trade: Street lighting
What this document does
- Pole schedule, lux readings and electrical tests for authority acceptance.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Written for: Street lighting.
What you get
- Excel schedules and summary sheet
- A full Arabic copy of every file, right to left
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Handover and close, Street lighting9 documents. Includes this document.