Structural steel fabrication, welding and bolting records

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Word and ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Structural steel

What this document does

  • Material traceability, welder qualification, NDT results and bolt torque records by connection.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
  • Written for: Structural steel.