Main Contractor and Subcontractor
Structural steel fabrication, welding and bolting records
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Word and ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Structural steel
What this document does
- Material traceability, welder qualification, NDT results and bolt torque records by connection.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
- Written for: Structural steel.
What you get
- Excel schedules and summary sheet
- Fillable form
- One-page guide on when and how to use it
- File: Word and Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project