Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Subcontract agreement, supply and installation

AED 399
Launch offerAED 199.50 on your first order, until 31 December.
Main ContractorSubcontractor
Clause
FIDIC Conditions of Subcontract 2011
Time limit
Set by the agreement
Format
Word, 10 pagesEnglish and Arabic copy, 14 pages
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Supply and install

What this document does

  • Bilingual back-to-back subcontract for labour and materials with scope, price, programme, payment-when-certified and flow-down schedules.
  • Sent by the Main Contractor to the Subcontractor.
  • Written to FIDIC Conditions of Subcontract 2011.
  • Step 14 of 14 in the Subcontract tender and award process.

What you get

Save with a pack

Main Contractor to Subcontractor: Sign and start8 documents. Includes this document.
AED 1,633AED 1,059Save AED 574
Subcontract tender and award process: Main Contractor steps9 documents. Includes this document.
AED 1,091AED 759Save AED 332
How to write it

How to write a subcontract agreement

A subcontract agreement lets a package back to back with the main contract: the subcontractor carries the main contract obligations for its work, and its time limits are shorter than yours, so you can pass claims and notices on in time.

What to include

  1. 1The parties and the accepted offer
  2. 2The scope, with what the price includes and excludes
  3. 3The price, payment terms, retention and any advance payment
  4. 4The programme and key dates, linked to the main programme
  5. 5The main contract provisions passed down, with shorter time limits
  6. 6Variations, claims, defects, securities and insurances
  7. 7Termination and the way disputes are resolved

When to use it

Before the subcontractor starts work. If work must start earlier, use a letter of intent with a cap and an expiry date until the agreement is signed.

Sample wording
The Subcontractor shall give notice of any claim within 21 days after becoming aware of the event and send the detailed claim within 35 days, so that the Contractor can give notice under the Main Contract within its 28 and 42 days.

Common mistakes

  • Time limits equal to or longer than the main contract’s, so claims cannot be passed on in time
  • A scope that says “as per tender” without listing what is included
  • No long-stop date for payment if certification under the main contract is late

Questions people ask

What does back to back mean?

The subcontractor takes on the main contract obligations that apply to its package, and its rights mirror yours, with shorter periods so you can meet the main contract’s.

How does payment work?

In this agreement the subcontractor is paid within 7 days after the Engineer certifies its work under the main contract, and at most 56 days after its statement, so late certification does not hold payment back indefinitely.

Where it sits in the processes

Subcontract tender and award, step 14 of 14View all
BeforeAcknowledgement of award and pre-contract checklist
This documentSubcontract agreement, supply and installation
End of the process

Also used between