Main Contractor and Subcontractor
AED 485AED 319Save AED 166
AED 207AED 139Save AED 68
Subcontract variation order
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorSubcontractor
Clause
FIDIC Conditions of Subcontract 2011Sub-Clause 13
Time limit
Set by the agreement
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Instructs the change and adjusts the subcontract sum and time back to back with the main contract.
- Sent by the Main Contractor to the Subcontractor.
- Written to FIDIC Conditions of Subcontract 2011, Sub-Clause 13.
- Goes with: Subcontract variation request
- Step 10 of 10 in the Variation process.
What you get
- Fillable form
- An English copy, and a copy with English and Arabic side by side
- One-page guide on when and how to use it
- File: Word, 3 pages
- File: English and Arabic copy, 3 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Subcontractor: Changes and claims5 documents. Includes this document.
Variation process: Main Contractor steps3 documents. Includes this document.
Where it sits in the processes
Variation, step 10 of 10View all