Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Variation order

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 13.3
Time limit
Set by the agreement
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

What you get

Save with a pack

Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
AED 454AED 299Save AED 155
Variation process: Supervision Consultant steps4 documents. Includes this document.
AED 346AED 239Save AED 107
How to write it

How to write a variation order

A variation order instructs a change to the Works and records its effect on the Contract Price and the Time for Completion. Under the FIDIC 1999 Red Book only the Engineer can instruct a Variation, at any time before the Taking-Over Certificate for the Works is issued (Sub-Clause 13.1).

What to include

  1. 1A variation order number and date, entered in the variation register
  2. 2The instruction, under Sub-Clause 13.1 or 13.3
  3. 3An exact description of the change, with drawing numbers and revisions
  4. 4The valuation: the agreed amount, or the basis if it is not yet agreed (contract rates, new rates or daywork)
  5. 5The effect on the Time for Completion, or that it will be dealt with under Sub-Clause 8.4
  6. 6Any records of Cost the Contractor must keep for the work
  7. 7The Engineer’s signature, the Employer’s approval where the Particular Conditions require it, and the Contractor’s acknowledgement

When to use it

Before the changed work starts where possible. For urgent work, issue the order with the valuation to follow; the value is then agreed or determined under Sub-Clause 3.5, using Sub-Clauses 12.3 and 13.3.

Read the full guideVariations in construction: request, proposal and variation order
Sample wording
Under Sub-Clause 13.3 you are instructed to replace the specified ceramic floor tiles in the main lobby with porcelain tiles to drawing A-401 Rev C. The agreed adjustment to the Contract Price is an addition of AED 86,500. The Time for Completion is not affected. Please acknowledge receipt of this Variation Order No. 14.

Common mistakes

  • A vague description that leads to arguments later about what was included
  • Starting work on a spoken instruction that nobody confirmed in writing
  • Leaving out the time effect, so it comes back later as a claim
  • Instructing without the Employer’s approval when the Particular Conditions require it

Questions people ask

Can the Contractor refuse a variation?

Only on the ground in Sub-Clause 13.1 of the 1999 Red Book: the Contractor cannot readily obtain the Goods required, and must promptly give notice with supporting particulars. The Engineer then cancels, confirms or varies the instruction.

What if the value is not agreed?

The Contractor carries out the work, and the Engineer agrees or determines the value under Sub-Clause 3.5, using the contract rates where they apply, or new rates under Sub-Clause 12.3.

Where it sits in the processes

Variation, step 9 of 10View all

Also used between