Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Supplier

Technical compliance sheet (specification against offer)

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install

What this document does

  • Clause-by-clause comparison of the specified requirement and the offered product, with deviations flagged.
  • Sent by the Supplier to the Main Contractor.
  • Written to UAE practice.
  • Step 1 of 6 in the Material and shop drawing submittals process.

What you get

Save with a pack

Supplier to Main Contractor: Tender7 documents. Includes this document.
AED 463AED 299Save AED 164

Where it sits in the processes

Material and shop drawing submittals, step 1 of 6View all
Start of the process
This documentTechnical compliance sheet (specification against offer)
AfterMaterial approval request and submittal register

Also used between