Engineer and Main Contractor

Material approval request and submittal register

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 7.2
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

What you get

Save with a pack

Main Contractor to Engineer: Build and monitor16 documents. Includes this document.
AED 1,126AED 729Save AED 397
Material and shop drawing submittals process: Main Contractor steps2 documents. Includes this document.
AED 178AED 119Save AED 59
How to write it

How to write a material approval request

A material approval request, or material submittal, gets each material, product or system approved before it is ordered. Under Sub-Clause 7.2 of the FIDIC 1999 Red Book, samples and the relevant information are submitted for the Engineer’s consent before the materials are used in the Works.

What to include

  1. 1The request number and revision, the specification section and the item
  2. 2The manufacturer, the supplier and the country of origin
  3. 3Technical data sheets, test certificates and authority approvals, such as Civil Defence approval for fire-rated products
  4. 4A compliance statement against the specification, listing any deviation
  5. 5Samples, labelled with their origin and intended use in the Works
  6. 6The date approval is needed to place the order on time

When to use it

Before you place the order, allowing the review period in the specification. Resubmit with a new revision after every rejection or revise-and-resubmit code.

Read the full guideMaterial submittals in construction: the package, approval codes and samples
Sample wording
MAR 042 Rev 0, Section 09 30 00, Tiling. We submit porcelain floor tiles, 600 x 600 mm, slip rating R10, from the approved supplier list, with the data sheet, the test certificates and two samples. The product complies with the specification with no deviations. Approval is needed by 2 July 2026 to meet the delivery date for Level 2.

Common mistakes

  • Ordering before approval, then replacing the material at your own cost
  • Hiding deviations from the specification instead of listing them
  • Missing certificates, which bring back a revise-and-resubmit code

Questions people ask

Does approval make the Engineer responsible for the material?

No. Under Sub-Clause 3.1 an approval does not relieve the Contractor of its responsibility. Order only against an approved code and follow the comments.

What do the status codes mean?

Most projects use A for approved, B for approved with comments, C for revise and resubmit, and D for rejected. Order against A or B, and follow the B comments.

Where it sits in the processes

Material and shop drawing submittals, step 2 of 6View all
Specialist equipment procurement, step 5 of 14View all
BeforeSingle-source justification form
This documentMaterial approval request and submittal register
AfterInternational purchase order with terms

Also used between