Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Technical evaluation sheet and report (consultants)

AED 129
Launch offerAED 64.50 on your first order, until 31 December.
EmployerEmployerinternal
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 6 pagesExcel, 9 sheetsLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 2. Proposal and awardRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Weighted criteria, individual evaluator sheets and the master report with pass mark and ranking.
  • Kept by the Employer as its own record.
  • Written to UAE practice.
  • Step 6 of 12 in the Supervision appointment and mobilisation process.

What you get

Save with a pack

Employer to Design Consultant: Proposal and award6 documents. Includes this document.
AED 544AED 349Save AED 195
Supervision appointment and mobilisation process: Employer steps6 documents. Includes this document.
AED 1,154AED 809Save AED 345

Where it sits in the processes

Supervision appointment and mobilisation, step 6 of 12View all
BeforeFee proposal and staffing schedule
This documentTechnical evaluation sheet and report (consultants)
AfterCombined evaluation report and award recommendation

Also used between